Data Centre Testing & Commissioning Services

Powering Reliability. Validating Performance. Ensuring Uptime.

At Greenventum, we understand that in a data-driven world, your data center is mission-critical. Our Data Center Testing & Commissioning (T&C) Services ensure every component—from power and cooling systems to fire safety and automation—is validated under real-world conditions before go-live.

Whether you’re launching a Tier III facility or upgrading your existing infrastructure, we deliver rigorous, standards-compliant commissioning that minimizes risk, ensures operational integrity, and supports SLA-driven uptime.

Why Testing & Commissioning Matters

Even the most advanced data centers can suffer from downtime due to overlooked installation errors, design gaps, or untested integrations. Our systematic, multi-phase T&C process ensures your facility is:

Functionally verified

Integrated and optimized

Zero compromise on uptime reliability

Peak energy and thermal efficiency

Smooth integration of modular & scalable systems

Regulatory and safety code compliance

Reduced long-term operating costs

We help clients move from construction to operation with confidence and compliance.

Strategic Due Diligence & Capacity Planning

  • Infrastructure Load Assessment
    Evaluate real-time and future load-bearing capacity across electrical and mechanical systems.
  • Scalability & Modular Planning
    Design adaptable, Tier-appropriate solutions that grow with your business while minimizing disruption.
  • Virtualization & Optimization Mapping
    Identify opportunities to improve performance through virtualization, containerization, and space utilization.
  • Design Feasibility & Investment Guidance
    Compare design alternatives with cost-benefit analysis to support capital planning and risk mitigation.
  • Lifecycle & Performance Forecasting
    Anticipate system degradation, technology obsolescence, and future expansion requirements.
  • Strategic due diligence ensures your data center infrastructure is:
    • Right-sized for current needs and future-proof for growth
    • Technically and financially aligned with business goals
    • Designed to comply with Uptime Institute, TIA-942, NBC, and global standards
    • Optimized for efficiency, cost control, and reliability

Mechanical Systems – Site Acceptance Testing (SAT)

We validate mechanical systems against live operational parameters:

Electrical System – Factory & Site Acceptance Testing

We verify your electrical backbone for safety, capacity, and redundancy:

Modular Integration & Tiered Capacity Optimization

We support scalable, high-availability infrastructures:

Scope of Our Data Center T&C Services

Pre-Commissioning Review & Documentation

  • Design and installation drawing verification
  • Method statements and SOP review
  • Vendor coordination and interface readiness

Power Infrastructure Testing

  • UPS & battery system validation
  • DG set load tests & fuel system checks
  • Transformer, LT/HT panel, and distribution board testing
  • Earth resistance and loop impedance testing
  • Thermography for all critical power equipment

Cooling Systems & HVAC Validation

  • PAC, CRAC, and chiller load testing
  • Redundancy checks (N+1, N+N)
  • Environmental zoning and airflow balancing
  • BMS integration and sensor verification

IT & Network Infrastructure Testing

  • Rack power and grounding verification
  • Structured cabling system certification
  • Patch panel labeling and connectivity testing

Safety & Security System Commissioning

  • Fire alarm, VESDA & gas suppression system testing
  • Emergency lighting, exit sign checks
  • Access control, CCTV & biometric validation
  • Smoke extraction and pressurization testing

Integrated Systems Testing (IST)

  • Full-scale simulations to validate redundancy, failover, and recovery protocols
  • Synchronization of electrical, mechanical & IT systems under load scenarios

Final Commissioning & Handover

  • Detailed punch list and compliance matrix
  • Commissioning certificate with as-built reports
  • Training to facility teams on operational procedures

Why Choose Greenventum?

Standards-Driven Approach

Compliance with Uptime Institute Tier Guidelines, TIA-942, ASHRAE, NBC, IS, and OEM specs.

Technical Expertise

Experienced engineers across electrical, mechanical, IT, and fire safety domains.

Root Cause Analysis & Risk Flagging

Identify design and installation flaws before they impact operations.

Optimized System Performance

Verify that all systems are not just functional—but efficient and resilient.

Comprehensive Commissioning Reports

Clear documentation including test results, thermal scans, load verification, system logs, and recommendations.

Industries We Serve

  • Tier II / III / IV Data Centers
  • Enterprise IT Hubs & Server Rooms
  • Banking & Financial Institutions
  • Cloud Infrastructure Providers
  • Healthcare & Research Facilities
  • Telecom & Network Operation Centers (NOCs)
  • Government & Smart City Data Nodes